Breaking New Ground on Cortez Pipeline Project

30 Aug 26 Aug, 2016


STATS Group has completed the leak-tight double block and bleed isolation of a high pressure CO2 pipeline system. The project, on behalf of Kinder Morgan, is a part of a pipeline intervention and isolation operation on a high pressure 30 in. CO2 pipeline extending over 500 miles from southwestern Colorado to Denver City in the US and operating at 2140 psi. STATS Group is a pioneer of fail-safe double block and bleed isolation of pipelines using its patented BISEP™ technology. All equipment used on the project has been designed, manufactured, assembled and tested at STATS Group’s facility in Houston, Texas.

Leave a Reply

Your email address will not be published. Required fields are marked *