russianconstruction.com 22 Feb, 2017
A total amount of funding for Sirik thermal power plant construction in Iran will be $1,4 billion. The ratio of the use of Russian materials, equipment, technologies will be 70 to 30 in favor of Russian companies. The total funding for the station is $1.4 billion, of which $1.2 billion will be allocated from the publicly funded loan.