Viterra to Build New Grain Terminal at Wadena

21 Sep

620ckrm.com 19 Sept, 2016

Viterra will build a new high-throughput grain terminal at Wadena. The facility will have a storage capacity of 34-thousand metric tonnes and will be able to load up to 156 railcars through a loop track. Construction will begin this fall and is expected to be completed by the fall of 2018.

Leave a Reply

Your email address will not be published. Required fields are marked *